Wednesday, June 20, 2012

What Is the Proposed Project?

The proposed project is a new electrical “distributing station.”  As DWP explained at the Town Hall meeting, a distributing station is a part of the DWP’s electrical generation, transmission, and distribution system.  It transforms voltage from high to low between the generating plant and the residential consumer. 

Although specific plans and design details have yet to be publicly disclosed, informal discussions between community members and DWP suggest that the installation will comprise of multiple buildings spread over a large footprint covering the entire site.  The proposed power distributing station is intended to supplement the existing Distributing Station 29 in the Palisades Village.  With ever-increasing energy demands, the community anticipates that the proposed distributing station may ultimately serve the entire greater Pacific Palisades area and beyond.  

About Us - Advocating For Safety First!

Coalition of Palisadians to Keep Marquez Safe was founded in February 2012 in response to the Los Angeles Department of Water and Power’s ...